Movies
-
Tom Cruise Pays Tribute to Val Kilmer With Moment of Silence at CinemaCon
“I’d like to honor my dear friend,” the “Top Gun” actor said before presenting his next “Mission: Impossible”
-
Channing Tatum Robs a McDonald’s in First ‘Roofman’ Footage
Derek Cianfrance is writer-director on this film about a former Army Ranger who turns to a life of crime robbing McDonald’s
-
‘Avatar: The Last Airbender’ Film Gets New Title
Aang will hit the big screen with a movie that bears his name in January 2026
-
Glen Powell Runs for His Life in First ‘The Running Man’ Footage
The film, directed by Edgar Wright, will be released on Nov. 7
-
‘M3GAN 2.0’ Trailer Pits One Deranged Robot Against Another
Oops, she’s killing again
-
‘The Naked Gun’ Trailer: Liam Neeson Takes Over for Leslie Nielsen in Comedy Reboot
Pamela Anderson co-stars in the Akiva Schaffer-directed Paramount comedy
-
Laurence Fishburne Reveals He Offered to Be in ‘The Matrix Resurrections’ But ‘They Didn’t Respond Well’
The actor also tells the hosts of “The View” if he’d be open to joining the fifth film
-
Hartbeat-Produced Stand-Up Doc ‘Group Therapy’ Debuts on Prime Video | Exclusive
The film features Mike Birbiglia, Nicole Byer, Tig Notaro and more sharing their mental health experiences
-
Amazon MGM Joins Legacy Hollywood With Slate of Thrillers, Dramas, Sci-Fi & Ryan Gosling at CinemaCon
The streamer brought out all its execs, including Prime Video chief Mike Hopkins, to prove it is committed to theaters for the long haul
Pro Available to WrapPRO members
WrapPRO -
‘Crime 101’: Halle Berry Locks Horns With Chris Hemsworth and Mark Ruffalo in Amazon Crime Thriller
CinemaCon 2025: The Oscar winner plays a cynical insurance lawyer who gets wrapped up in a major heist
-
‘Mercy’ First Look: Chris Pratt Has 90 Minutes to Prove to AI That He Didn’t Kill His Wife
The film will be released on Jan. 23, 2026
-
Julia Roberts Is Caught in a Sexual Assault Scandal in First Look at Luca Guadagnino’s ‘After the Hunt’
CinemaCon 2025: Amazon MGM will release the thriller on October 10
-
‘Verity’: Colleen Hoover Joins Amazon’s Slate With Tale of a Ghostwriter’s Nightmare
Anne Hathaway, Dakota Johnson and Josh Hartnett will star in the thriller coming May 2026
-
‘Project Hail Mary’ Trailer: Ryan Gosling Goes on a Suicide Mission to Save the Sun in Phil Lord and Chris Miller’s Sci-Fi Spectacle
The saga from directors Phil Lord and Christopher Miller is adapted from Andy Weir’s 2021 novel of the same name